Skip to content
Linkly
Case study. Manufacturing. May 2026

40 Factory.

Manufacturing system integrator based in Piacenza. They signed the Linkly contract on May 21, 2026, a few days before SPS Italia. They are among the early clients who trusted us on Linkly. The case study is published with their permission.

Client
40 Factory
Headquarters
Piacenza, Emilia-Romagna
Sector
Manufacturing. System integrator
Activation date
May 21, 2026
Annual events
5-7 trade fairs
First Linkly-active event
SPS Italia 2026 (May 26-28)

Who 40 Factory is

40 Factory is a system integrator and supplier of industrial automation solutions based in Piacenza. It works with OEM machine builders and Northern Italian manufacturing SMEs, specializing in the integration of automation systems, robotics and digital factory for the Italian manufacturing sector. It has historically attended 5-7 industry trade fairs per year, mainly in Italy (SPS Italia, MECSPE, BI-MU) and Europe (Hannover Messe, Automatica Munich).

The pain before Linkly

The 40 Factory sales team is typical in size for Italian manufacturing system integrators: 4-6 people at the trade fair, technical focus, 6-18 month sales cycle for automation projects. Pre-Linkly, the workflow was:

The perceived problem was not lead quality (high, as typical in Italian manufacturing), but follow-up speed and data enrichment: technical business cards often only carried name + company + email, with no specific role, revenue, machine fleet. To run well-tuned follow-up, the salesperson had to do LinkedIn + company website + Crunchbase research for each lead. 15-30 minutes per contact, not scalable across 100+ leads per event.

The Linkly configuration

During onboarding (1 hour video call with the dedicated Linkly consultant), 40 Factory configured:

  1. Qualification questions specific to SPS Italia: machine type under evaluation, CapEx timing, project size, decision-making stakeholder
  2. Follow-up templates: two variants. One for the OEM technical buyer, one for the end plant manager. Both in Italian, with integration datasheet + case study of a similar project attached
  3. CRM integration with their company system (HubSpot) via API. Custom field configuration: source = "SPS Italia 2026", heat score priority, enriched machine fleet
  4. Routing: "hot" leads (heat score >12) → immediate alert to the senior salesperson via Slack; "warm" leads → assignment within 24 hours to the area salesperson

SPS Italia 2026 (May 26-28). First Linkly-active event

This section will be updated with the actual event results after mid-June 2026, with 40 Factory's permission to publish specific numbers. For now we publish the pre-event configuration and the target objectives stated by the client.

Target objectives stated pre-SPS Italia 2026:

What 40 Factory taught us

The 40 Factory case is important for Linkly for reasons that go beyond the initial engagement. It confirms our ICP pattern:

Client quote

"We decided on Linkly 5 days before SPS Italia. It was a gamble, but the consultant configured everything in a one-hour video call. We'll see in June what it brings home compared to previous years."

. Sales management 40 Factory, May 21, 2026

Further reading

Want to be the next case study?

Linkly accepts early adopter clients during 2026 on favorable terms. Free demo to understand if it is right for you.

Go deeper with AI

Linkly pages are optimised to be read correctly by AI assistants. Open the conversation in your preferred one with the context already in place, or copy the prompt to use it anywhere.